Atelierdb were appointed to provide RIBA workstages 4-7, to develop Planning Approved drawings for Tender and thereafter Construction drawings and oversee the works on site. The 8 flats are now completed on site, with the build undertaken by Hystar Construction using a Design&Build Contract. All flats were let within 1 week of Practical Completion.
We used traditional build techniques and materials as required by the Planning Approved Design. 10 parking spaces were provided on site, with 8 being in a semi-submerged parking area at the East end of the site, with a mass concrete retaining wall holding back the adjoining properties which are above the site.
Construction Drawings
On Site Coordination
Planning
Precast Concrete Beams and Stair
Roof Design, Tender and Works
Confidential
Construction Drawings
On Site Coordination
Planning
Precast Concrete Beams and Stair
Roof Design, Tender and Works
Confidential
If you like this project and want to discover how we can help with your own, get in touch
info@atelierdb.com | +44 (0) 203 142 7672
Back